Gjuvsland (Svein Nord)

Gjuvsland

19.06.2018 - 16:21

Main mine shaft in Valaheigruva mine.

Varaldsøy- mining

19.06.2018 - 16:13

There is still a lot of ore in the abandoned mines on Varaldsøy Island. If today's prices and availability of ore continue, it is doubtful whether the mines will resume operation. But, the pyrite is there, if the market should return. On Varaldsøy Island one finds at least nine mines and prospect pits, that for the most part date back to the latter part of the 1800s.

Mine hole above Kvitebergsvatnet Lake, by Atramadalen.

Ølve- Mining

05.01.2019 - 15:28

All in all there are ten known copper mines and two iron mines on the Ølve peninsula. Geologically, the nine mines on Varaldsøy Island also should be figured in. The industry began at Lilledal in 1642 wth the mining of iron ore. From Jernsmauget by Dyråsen, the iron ore was sent to the iron works in eastern Norway.

Frøland power station and lake Frøland.

Frøland

18.03.2018 - 08:03

Much rain, a steep drop and nearness to Bergen meant that the power-making potential of the Samnanger water system was exploited early. Samnanger was thus one of the first power-producing municipalities in western Norway. With its subsequent expansion and new power stations, about 400 gigawatts of electricity per hour were produced on average each year. This is enough to meet the energy needs of 25,000 households.

The combination building at Nordvik.

Nordvik

16.06.2018 - 17:27

The power station at Herlandsfossen, Osterøy

Herlandsfossen

18.03.2018 - 08:14

Litlandsvatnet

13.12.2018 - 13:54

Large quantities of nickel ore have been mined from Litlandsvatnet, between Lonevågen and Hosanger. The discovery was made in 1875. During the period of operation from 1882 to 1945, 4170 tonnes of pure nickel were extracted from 462 000 tonnes of ore, a large production by Norwegian standards.

Dale power station

Dale power station

18.03.2018 - 08:16

In 1923 Bergenshalvøens Kommunale Kraftselskap (BKK) expropriated large areas for power plants and development of hydropower started soon afterwards. Dale power station with the two first aggregates, each of 14 MW was put into operation on 17 November 1927. In the supply reservoir in Storefossen 5152 cubic metres of concrete were cast, and a modern and well-equipped power station was built.

A silled lake at Ekse

Eksingedalen- hydropower development

13.12.2018 - 16:56

Water discharge at the outlet of the Ekso into Eidsfjord was halved after the big hydropower development in the mountainous area between Modalen and Eksingedalen and further southward toward Evanger in the 1960s, 70s and 80s. In an attempt to amend the changed environmental conditions in the waterway the developer built 35 small dams in the river.

Kårstad, Veafjorden

Stamnes

18.06.2018 - 20:13