- Remove Cultural landscapes filter Cultural landscapes
- Remove Hydro power filter Hydro power
- Remove Masfjorden filter Masfjorden
- Remove Samnanger filter Samnanger
- Remove Voss, frå 2020 del av nye Voss herad. filter Voss, frå 2020 del av nye Voss herad.
- Remove Archaeological findings filter Archaeological findings
- Remove Chieftains and royal lines filter Chieftains and royal lines
- Remove Rock carvings filter Rock carvings
- Remove Vegetation history filter Vegetation history
- Remove Sund, frå 2020 del av nye Øygarden kommune filter Sund, frå 2020 del av nye Øygarden kommune
- Remove Bømlo filter Bømlo
- Remove Vaksdal filter Vaksdal
![Frøland power station and lake Frøland.](https://www.grind.no/sites/default/files/styles/medium/public/bilder/sted/232/sam_4.jpg?itok=7O9c4Igu)
Frøland
Much rain, a steep drop and nearness to Bergen meant that the power-making potential of the Samnanger water system was exploited early. Samnanger was thus one of the first power-producing municipalities in western Norway. With its subsequent expansion and new power stations, about 400 gigawatts of electricity per hour were produced on average each year. This is enough to meet the energy needs of 25,000 households.
![The combination building at Nordvik.](https://www.grind.no/sites/default/files/styles/medium/public/bilder/sted/232/kvh_250-2.jpg?itok=CxcVlWaV)
![Archaeological fins from the sites at Risøya.](https://www.grind.no/sites/default/files/styles/medium/public/bilder/sted/232/kvh_276-2.jpg?itok=hxoLOQ5s)
![St. Ludvig.](https://www.grind.no/sites/default/files/styles/medium/public/bilder/sted/232/kvh_274-4s.jpg?itok=gXvooPsW)
Tyssøy
B.E.Bendixen, who has written about “The Churches in Søndre Bergenhus Amt”, believed even around 1900 that there was evidence at Tyssøy of the church or the chapel of the Holy Ludvig (Louis). Two large stone blocks had lain in the western wall of the church’s nave, and this wall showed a length of 16 meters in the terrain.
![Hummelfossen power station., Masfjorden](https://www.grind.no/sites/default/files/styles/medium/public/bilder/sted/1/kvh_320_z.jpg?itok=8fLzrW-Q)
Hummelfossen
As early as 1906 the Matre and Haugsdal waterway was bought up by the businessman Blauuw from Bergen; the first “waterfall speculator” in the Matre area. He immediately resold it to Fr. Hiorth, who transferred all the rights to the company Matrefaldene in 1908. Behind A/S Matrefaldene were German interests, Badische Anilin und Sodafabrik, which wanted to start production of saltpetre fertilizer with nitrogen and electricity.
![Storsetehilleren/Matrehola](https://www.grind.no/sites/default/files/styles/medium/public/bilder/sted/1/kvh_319-3.jpg?itok=VSiOpI2L)
Matrehola
On a large gravel terrace in Matredalen (the Matre valley), a couple of kilometres from the coastal settlement Matre, lies Storseterhilleren, at the end of a large stone block that came rushing down from the mountain. The Matre river runs just over 100 metres to the east of the cave.
![Best salmon spot in the county](https://www.grind.no/sites/default/files/styles/medium/public/bilder/sted/232/mas_20.jpg?itok=J1hd8Bvb)
![The iron bars found at Rambjørg.](https://www.grind.no/sites/default/files/styles/medium/public/bilder/sted/232/kvh_319-2.jpg?itok=Kl9g7nMT)
![The old communal hamlet before 1910.](https://www.grind.no/sites/default/files/styles/medium/public/bilder/sted/1/kvh_333-4.jpg?itok=ruUK20e1)
Dale farm
The Dale farm lies well situated on the gravel by the river, below the mountain Beitelen. But a few stone throws further north, on the wide expanse behind the houses, there has been an older farmstead. Here there have been found a number of cooking hollows, pole holes, an old road and traces of something believed to have been a palisade. Finds from this oldest farmstead may be dated to the time of the migrations, 400-600 years A.D.
![Dale power station](https://www.grind.no/sites/default/files/styles/medium/public/bilder/sted/232/kvh_333-4xx.jpg?itok=Y26ZxQM5)
Dale power station
In 1923 Bergenshalvøens Kommunale Kraftselskap (BKK) expropriated large areas for power plants and development of hydropower started soon afterwards. Dale power station with the two first aggregates, each of 14 MW was put into operation on 17 November 1927. In the supply reservoir in Storefossen 5152 cubic metres of concrete were cast, and a modern and well-equipped power station was built.